01-21-2012, 06:24 AM
(01-20-2012, 05:29 PM)Gors Wrote: I mean, you can dig five blocks after placing the first column!! that doesn't sound fair; I know that the dirt is being supported on both ways, but I am thinking on a way to nerf the column a bit. I planned having to use it each two steps or so, not 5 by 5.Everything is possible when your man smells like old spice and not a lady.
if it is not possible, I'll have to consider a bigger playboard.
I can easily tweak it so there's a maximum of two free blocks between two columns. A maximal gap of only one block would require a little bit more work.
One question though, this came to my mind when thinking about those one block gaps:
Code:
Digits represent common blocks like Dirt with their respective stability level. Blocks wioth 0 would fall.
10
321
32
3
Code:
Same as above.
101
321 123
32 23
3 3